Live demo · 10-min walkthrough · Denver, CO

This is the actual bid drafted from a recorded site walkthrough — basement finish, 16 line items, $78,403 recommended. Toggle between Internal and Client views to see what your contractor sees vs. what your homeowner gets.

Recommended Bid · 1024 Maple Ridge Dr. — Basement Remodel
$86,157

Subtotal $60,310 + % overhead + % profit + % contingency.

Subs Required
PlumberElectricianConcrete Cutter

Pricing notesPricing based on current Denver, CO metro rates for 2026, assuming a finished basement area of approximately 900 sqft. Allowances are included for specific finishes like LVP, tile, vanity, and wet bar components, which may be adjusted based on client selections. Below-grade plumbing is a significant cost driver.

COST-01

Cost Summary

Materials$17,425
Labor$25,385
Subcontractors$17,500
Subtotal$60,310
Profit Margin%
$25,847
Recommended Bid Total$86,157
Materials %
29%
Labor %
42%
Subs %
29%
DRAFT-01

1024 Maple Ridge Dr. — Basement Remodel

Project Type

Basement Finish/Remodel

Trade

General Contractor

Client

Dave & Sarah

Sarah has significant input on aesthetic choices and specific finishes (e.g., larger vanity, tile shower, modern farmhouse style).

Property

residential

Areas Affected

Basement Family Room · Basement Bathroom · Basement Wet Bar

Target Completion

Before Thanksgiving

Approx. Sq Ft

900 sqft

CHANGE-LOG

Mid-walk scope changes · 4

Captured the moments the client changed their mind during the walk — the details that get lost in static notes.

Original
Bathroom size 8x7 (56 sqft)
Changed to
Bathroom size 8x8 (64 sqft) to accommodate 30-inch vanity and more elbow room.
Sarah (client)
Original
Shower surround could be fiberglass.
Changed to
Shower surround will be tile.
Sarah (client)
Original
Flooring could be carpet.
Changed to
Flooring will be LVP (Luxury Vinyl Plank).
Dave (client)
Original
Wall insulation could be 1x3 furring strips directly on concrete.
Changed to
Wall insulation will be 2x4 furring, rigid foam, and batt insulation (Path 1).
Dave (client) based on contractor recommendation.
SCOPE-01

Scope of Work · 16 items

ItemSubMaterialsLaborSubTotalConf.
Permits & Inspections (Building, Plumbing, Electrical)

1 set

Includes fees for all necessary permits for a basement finish, plumbing, and electrical work. Contractor will pull permits.

$2,500$2,500medium
Dust Control & Site Protection

1 job

Plastic sheetingZipper doorTape

Includes zip walling stairs, plastic barrier, zipper door, and HEPA air scrubber on dirty side for duration of job.

$300$520$820high
Verify Existing Wall Framing

1 wall

Inspect existing 2x4, 16" OC wall for plumb and pressure-treated bottom plate. No tear-out needed if satisfactory.

$340$340high
Concrete Sealer Application

Approx. 900 sqft

Concrete sealer

Apply sealer to bare concrete floor before framing for peace of mind against moisture.

$200$260$460high
Concrete Saw Cutting & Trenching for Plumbing

20 linear feet

Saw cut a trench from bathroom corner to main stack for new plumbing lines. Includes concrete removal and disposal.

Concrete Cutter$2,500$2,500high
Plumbing Rough-in (3/4 Bath & Wet Bar)

1 job

Install new drain and vent lines for shower, toilet, bathroom sink, and wet bar sink (cold water only). Tie into main stack below grade.

Plumber$7,500$7,500medium
Concrete Patching

20 linear feet

ConcreteRebar/mesh

Patch concrete trench after plumbing rough-in.

$100$520$620high
Framing (New Walls & Soffits)

Approx. 160 linear feet

2x4 lumberRigid foam insulationBatt insulationFasteners

Includes furring out perimeter walls (Path 1: 2x4s, 16" OC, 1/2" off concrete, rigid foam, batt insulation), framing for 8x8 bathroom, wet bar, and soffits around main ductwork.

$2,300$6,460$8,760high
Electrical Rough-in

1 job

Install new circuits (at least 3: bathroom, family room outlets, dedicated for wet bar fridge), recessed lights, switches, and outlets.

Electrician$5,000$5,000medium
Drywall Installation

Approx. 1500 sqft

1/2" drywall (walls)5/8" drywall (ceiling)Drywall screwsJoint compound+1 more

Install 1/2" drywall on walls and 5/8" drywall on ceilings (code). Includes hanging, taping, and 3 coats of mud.

$2,625$5,625$8,250high
Painting

Approx. 1500 sqft

PrimerNeutral wall paintDeeper color trim/door paint (satin finish)Tape+1 more

Includes priming, two coats of neutral paint on walls and ceilings, and two coats of deeper color satin finish paint on trim and doors.

$1,200$4,875$6,075high
Flooring Installation (LVP)Allowance

Approx. 836 sqft

Luxury Vinyl Plank (LVP)UnderlaymentTransition strips

Install LVP flooring in main family room area. Client chose LVP over carpet for basement application.

$5,400$2,475$7,875high
Bathroom Finishes (3/4 Bath)Allowance

1 job

Tile (shower walls/pan)Setting materialsGroutComfort height toilet+5 more

Includes tile shower (client choice), comfort height toilet, 30" vanity with sink and faucet, shower fixtures, bathroom fan/light, and basic accessories.

$2,350$2,075$4,425medium
Wet Bar FinishesAllowance

1 job

CabinetryCountertopSinkFaucet+1 more

Includes cabinetry, countertop, sink with cold water faucet, and mini-fridge.

$2,350$745$3,095medium
Trim Installation

Approx. 100 linear feet

BaseboardsDoor casingsCaulkNails

Install baseboards and door casings throughout finished basement area.

$500$1,360$1,860high
Access Panels

3 panels

Flush access panels

Install flush access panels for plumbing cleanouts, shut-offs, and electrical junction boxes as required by code and for future access.

$100$130$230high
Subtotal$17,425$25,385$17,500$60,310
TIME-01

Timeline & Constraints

Target

Before Thanksgiving

Constraints captured
  • ·tight, but it's doable if we move on permits in the next two weeks
  • ·about eight weeks of active work
BUDGET-01

Budget Signals (verbatim)

No specific budget number stated by client.

  • "getting a few quotes
  • "I'm probably not the cheapest
  • "I'll be the most detailed and I won't surprise you with change orders
  • "That's the single biggest line item in this whole job (plumbing rough-in)
  • "That sounds like a lot (client reaction to plumbing cost)
INCL

Inclusions

  • Permits & Inspections (Building, Plumbing, Electrical)
  • Dust Control & Site Protection
  • Verify Existing Wall Framing
  • Concrete Sealer Application
  • Concrete Saw Cutting & Trenching for Plumbing
  • Plumbing Rough-in (3/4 Bath & Wet Bar)
  • Concrete Patching
  • Framing (New Walls & Soffits)
  • Electrical Rough-in
  • Drywall Installation
  • Painting
  • Flooring Installation (LVP)
  • Bathroom Finishes (3/4 Bath)
  • Wet Bar Finishes
  • Trim Installation
  • Access Panels
EXCL

Exclusions

  • Carpet in basement
  • Drop tile ceiling
  • Fiberglass shower surround
COMMIT

Contractor commitments · 8

Every promise the contractor made on the call — captured verbatim. Useful for proposal copy, dispute resolution, and accountability.

  • "Provide a detailed, itemized bid by Thursday (within 48 hours)."
  • "No surprise change orders."
  • "Be transparent about timeline once numbers are finalized."
  • "Show cost difference between wall insulation options (Path 1 vs. Path 2)."
  • "Mark access panel locations on plans."
  • "Pull permits within two weeks of contract signing."
  • "Implement dust control measures (zip wall, plastic barrier, zipper door, HEPA air scrubber)."
  • "Ensure proper dry times for mud and paint."
CONCERNS

Client concerns to address

  • Cost (getting multiple quotes, plumbing cost)
  • Moisture/mold issues in basement
  • Dust from construction affecting kids and dog upstairs
  • Access to plumbing/electrical for future issues
  • Meeting Thanksgiving timeline
OPEN

Open questions for follow-up

  • ?Specific LVP product/style selection.
  • ?Specific tile selection for shower.
  • ?Specific vanity style/material.
  • ?Exact paint colors (within neutral/dark trim scheme).
  • ?Detailed layout of family room (e.g., exact number/placement of outlets beyond minimums).
  • ?Specific fixtures/finishes for the wet bar (cabinetry, countertop style).
Prepared with UR Bids · Walk · Talk · Bid

From a 10:15 site walkthrough.